PPL has made a Gas condensate discovery in Shah Bandar Exploration Licence at Jhim East-1 well in Sindh Province. The well was spud-in on October 8, 2023 and drilled to the depth of 2545 meters. Testing was carried out in A Sands of Lower Goru Formation which flowed at the rate of 13.69 MMCFD Gas and 236 BCPD condensate through 32/64” choke size at well head flowing pressure of 2668 PSI.